Education is our largest operational sector, with projects scheduled outside of student attendance periods.
Our branch manages multiple sites concurrently during the six- to eight-week December to January holiday period, often overseeing up to six schools. We schedule high-access boom operations, high-pressure wash-downs, and abrasive blasting during these breaks to eliminate risk to students.
- St Paul’s Anglican Grammar
- Gippsland Grammar
- Catholic Diocese and Regional Private Schools: Scheduled holiday repaints, staged interior/exterior service works, and post-repair anti-mould remediation.







